Thu Thiem 2 Bridge Construction Project
1. Location: Connect between Ton Duc Thang Street, District 1, and Thu Thiem New Town, District 2 in Ho Chi Minh City
2. Developer: VINACONEX Corporation
3. Investment form: Build - Transfer (BT); after completing, VINACONEX will develop two land areas in District 1 and District 2 of Ho Chi Minh City
4. Project size:
- Total length 1.2 km, including the bridge over Sai Gon River toward Ton Duc Thang Street with 6 lanes in width and 0.5 km in length, BxH = 80 x 10 meters.
- The ramp is 0.7km in length
- Two intersections at the beginning and end of the route.
- Two intersections within Thu Thiem New Town and Ton Duc Thang Street
5. Sources of capital: corporate development fund, loan capital from commercial credit and other sources of capital
6. Duration of projects: approximately 40 months